12 June 2025
·7 min read
WorkSafe New Zealand's Approved Code of Practice for Scaffolding sets the baseline for every scaffold erected in this country. It is not optional reading — it defines your legal duties as a PCBU (Person Conducting a Business or Undertaking) and directly shapes what happens when things go wrong. Site managers often assume the scaffolding contractor carries all responsibility once the structure goes up, but that assumption has cost projects dearly. The duty of care is shared, and understanding where your obligations begin and end is fundamental to running a compliant site.
Understanding Your Shared Duty of Care
The Health and Safety at Work Act 2015 introduced the concept of overlapping duties — where multiple PCBUs share responsibility for the same workers or workplace. As a site manager, even if you didn't erect the scaffold, you have a duty to ensure it remains safe for everyone who uses it. This means you cannot simply hand over responsibility to the scaffolding contractor and walk away. Regular inspection, incident reporting, and enforcement of safe access protocols are all part of your role.
Before any scaffold is erected, a competent person must assess the site and determine the appropriate scaffold type, working load, and tie-in requirements. For anything over five metres, that assessment needs to be documented. On Southern Lakes worksites — where wind loading from mountain gaps can shift dramatically between morning and afternoon — this documentation is especially critical. A scaffold that passed inspection at 8am in calm conditions can be compromised by a 60km/h nor'wester by midday. Site managers should be building wind load reviews into daily pre-start routines rather than treating them as a set-and-forget exercise.
What a Compliant Scaffold Programme Looks Like
A truly compliant scaffold programme involves more than just erecting tubes and boards to specification. It requires an ongoing management commitment from the day the first section goes up to the day the last section comes down. Here is what that looks like in practice:
- A documented handover certificate signed by a competent scaffolder before first use
- Weekly formal inspections with written records retained on site
- Immediate re-inspection after any significant weather event, seismic activity, or impact
- Clear signage indicating working load limits, access points, and exclusion zones
- A process for workers to report scaffold defects without fear of reprisal
- Regular toolbox talks covering scaffold-specific hazards for the current stage of works
Handover Certification
Handover certification is the final safeguard before any worker accesses a new scaffold. Under the ACOP, a competent scaffolder must sign off that the structure meets the design specification and is safe for the intended use. Site managers should be receiving this documentation and filing it — not simply waving scaffolders off and assuming everything is in order. Regular inspections at minimum weekly intervals, and after any event that could affect structural integrity, are a non-negotiable part of keeping your site on the right side of the law and, more importantly, keeping your team safe.
Record Keeping and Audit Readiness
WorkSafe investigations following scaffold incidents are thorough. Inspectors will request inspection records, handover documentation, toolbox meeting minutes, and evidence that relevant workers received adequate scaffold induction training. Gaps in these records — even if the scaffold itself was structurally sound — can result in infringement notices and, in serious cases, prosecution. Building a simple scaffold register into your site management system from day one costs very little time and creates substantial protection when it matters most.